To give you an impression of the projects which have been carried out
during 2010 and 2011:
- Van Oord,
coordination of design and basic design of newbuilding projects
- Groupsleader
construction&outfit at Oceanco, mainly involved in yachts which have to
comply to the Passenger Yacht Code (PYC)
- Projectmanager
Engineering at Damen:
o Responsible for the integration of the dredging system into hopperdredgers
- Mainframe
calculations for several inland waterway container vessels and dry cargo
vessels
- FEM-calculations
of deckstructures in order to evaluate the stresses around big holes in
webframes. Those calculations are carried out in close cooperation with the classification
society.
- Coordination of lifting and seagoing transport of several hulls from China to the Netherlands
- Supervision of the building of inland waterway vessels
| |
|